Iron Ore Terminal
In order to import and supply 8 million tons of iron ore per year so as to fulfill the requirements of the Iranian steel industry, the design and construction o f a new pier in Bandar Imam Khomeini was entrusted to Omran Falat as an EPC project.
- Location: Petrochemical Special Economic Zone of Bandar Imam Khomeini
- Deck: 304 m x 26 m
- Top of the deck: +7.5 m from CD (Chart Datum)
- Dredged level: -15 m from CD
- Dredging: 1,050,000 m3
- Earthworks: 200,000 m3
- Piling: 22,000 m
- Formworks: 29,000 m2
- Concrete: 70,000 m3